Glass Bottle Spray Production Line

- Mar 21, 2018-

Glass bottle spray production line generally has a spray room, hanging chain and oven components. Glass bottles are also used for front-end water treatment, and glass bottles need special attention to sewage discharge. As for the quality of the sprayed glass bottles, it is recommended that the following methods be used for water treatment, surface cleaning of the workpiece, electrical conductivity of the hooks, amount of gas, amount of powder sprayed, and operator level. The bottle pre-treatment section includes de-oiling and pre-stripping. , The main off, table adjustment, etc., if it is in the north, the main part of the temperature can not be too low, the need for insulation or treatment effect is not ideal; 2, preheating section before processing will enter the warm-up section, in general. 8 to 10 minutes need, the glass bottle is best to reach the spray room when the workpiece to be sprayed to have a certain amount of waste heat, in order to increase the adhesion of powder; 3 glass bottle soot purification process if the workpiece is sprayed. The requirement is relatively high. This section is indispensable. If there is a lot of dust adsorbed on the workpiece, the surface of the processed glass bottle will have a lot of granules, which will reduce the quality and quality. 4 Dusty section. The key is the technical problem of the powdering master. If you want to create good quality, it takes a good master of technology to pay for it. 5. Drying section. This section should pay attention to the temperature and baking time, the powder is generally 180 to 200 degrees is better, depending on the glass material, the glass surface should not have oil, and the drying furnace should not be too far away from the dust room, usually 6 meters As well.